NESO called a Turn Down event on 5 Dec 2023, running from 17:30 to 18:30 across 2 half-hour settlement periods. 1.04 GW was procured against a 500.0 MW requirement (208% fill rate), with 22 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
1.04 GW
208% of requirement
Bid Cost
£1.56m
Bids
78 / 78
accepted / total
Participants
22
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:30
18:00
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 421.0 MW | £1.26m | £3000/MWh |
| BRITISH GAS TRADING LIMITED | 163.0 MW | £489.0k | £3000/MWh |
| EDF ENERGY CUSTOMERS LIMITED | 92.0 MW | £276.0k | £3000/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 88.0 MW | £264.0k | £3000/MWh |
| INFINIS LIMITED | 58.0 MW | £174.0k | £3000/MWh |
| E.ON NEXT ENERGY LIMITED | 44.0 MW | £132.0k | £3000/MWh |
| PERSE TECHNOLOGY LIMITED | 28.0 MW | £84.0k | £3000/MWh |
| ENGIE POWER LIMITED | 24.0 MW | £72.0k | £3000/MWh |
| SOLO ENERGY LIMITED | 24.0 MW | £72.0k | £3000/MWh |
| OAKTREE POWER LIMITED | 16.0 MW | £48.0k | £3000/MWh |
| CONRAD ENERGY (TRADING) LIMITED | 14.0 MW | £42.0k | £3000/MWh |
| AXLE ENERGY LIMITED | 12.0 MW | £36.0k | £3000/MWh |
| EQUIWATT LIMITED | 10.0 MW | £30.0k | £3000/MWh |
| GRIDBEYOND LIMITED | 8.0 MW | £24.0k | £3000/MWh |
| CUB (UK) LTD | 6.0 MW | £18.0k | £3000/MWh |
| GRIDIMP LTD | 6.0 MW | £18.0k | £3000/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 6.0 MW | £18.0k | £3000/MWh |
| OVO ELECTRICITY LTD | 6.0 MW | £18.0k | £3000/MWh |
| FLEXITRICITY LIMITED | 4.0 MW | £12.0k | £3000/MWh |
| UTILITA ENERGY LIMITED | 4.0 MW | £12.0k | £3000/MWh |
| CHAMELEON TECHNOLOGY (UK) LIMITED | 2.0 MW | £6.0k | £3000/MWh |
| ORANGE POWER LTD | 2.0 MW | £6.0k | £3000/MWh |