NESO called a Turn Down event on 29 Feb 2024, running from 18:00 to 18:30 across 1 half-hour settlement periods. 151.0 MW was procured against a 125.0 MW requirement (121% fill rate), with 22 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
125.0 MW
Procured
151.0 MW
121% of requirement
Bid Cost
£84.9k
Bids
17 / 50
accepted / total
Participants
22
Accepted Volume by Participant
Aggregated across 1 half-hour periods, sorted by accepted volume
All bids rejected (14)
BRITISH 50.0 MW @ £1250/MWhINFINIS 22.0 MW @ £1725/MWhE.ON 18.0 MW @ £1300/MWhENGIE 13.0 MW @ £1500/MWhOAKTREE 13.0 MW @ £1607/MWhAXLE 10.0 MW @ £1429/MWhOVO 7.0 MW @ £1250/MWhGRIDIMP 4.0 MW @ £1500/MWhURBAN 4.0 MW @ £1450/MWhFLEXITRICITY 2.0 MW @ £1500/MWhHILDEBRAND 2.0 MW @ £2450/MWhUTILITA 2.0 MW @ £1500/MWhLEVELISE 1.0 MW @ £1448/MWhSSE 1.0 MW @ £1500/MWh
Half-Hour Periods
18:00
ProcuredSettledReq: 125.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 93.0 MW17.0 MW rejected | £111.6k | £1200/MWh |
| EDF ENERGY CUSTOMERS LIMITED | 28.0 MW | £27.6k | £985/MWh |
| PERSE TECHNOLOGY LIMITED | 14.0 MW7.0 MW rejected | £14.3k | £1020/MWh |
| GRIDBEYOND LIMITED | 6.0 MW | £6.0k | £1000/MWh |
| SOLO ENERGY LIMITED | 4.0 MW1.0 MW rejected | £4.2k | £1050/MWh |
| CUB (UK) LTD | 3.0 MW | £3.0k | £997/MWh |
| EQUIWATT LIMITED | 2.0 MW3.0 MW rejected | £2.3k | £1125/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 1.0 MW14.0 MW rejected | £999 | £999/MWh |
| BRITISH GAS TRADING LIMITED | 0.0 MW50.0 MW rejected | £0 | £1250/MWhrej |
| INFINIS LIMITED | 0.0 MW22.0 MW rejected | £0 | £1725/MWhrej |
| E.ON NEXT ENERGY LIMITED | 0.0 MW18.0 MW rejected | £0 | £1300/MWhrej |
| ENGIE POWER LIMITED | 0.0 MW13.0 MW rejected | £0 | £1500/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW13.0 MW rejected | £0 | £1689/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW10.0 MW rejected | £0 | £1429/MWhrej |
| OVO ELECTRICITY LTD | 0.0 MW7.0 MW rejected | £0 | £1250/MWhrej |
| GRIDIMP LTD | 0.0 MW4.0 MW rejected | £0 | £1500/MWhrej |
| URBAN RESERVE (ASSETCO 2) LIMITED | 0.0 MW4.0 MW rejected | £0 | £1450/MWhrej |
| FLEXITRICITY LIMITED | 0.0 MW2.0 MW rejected | £0 | £1500/MWhrej |
| HILDEBRAND TECHNOLOGY LIMITED | 0.0 MW2.0 MW rejected | £0 | £2450/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW2.0 MW rejected | £0 | £1500/MWhrej |
| LEVELISE LIMITED | 0.0 MW1.0 MW rejected | £0 | £1448/MWhrej |
| SSE DIGITAL SERVICES LIMITED | 0.0 MW1.0 MW rejected | £0 | £1500/MWhrej |