NESO called a Turn Down event on 29 Nov 2024, running from 16:00 to 19:00 across 6 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 1 participant submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 6
accepted / total
Participants
1
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (1)
GRIDIMP 12.0 MW @ £1200/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| GRIDIMP LTD | 0.0 MW12.0 MW rejected | £0 | £1200/MWhrej |