NESO called a Turn Down event on 3 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 246.0 MW was procured against a 500.0 MW requirement (49% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
246.0 MW
49% of requirement
Bid Cost
£16.5k
Bids
36 / 75
accepted / total
Participants
10
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (8)
OCTOPUS 267.3 MW @ £250/MWhDRAX 36.0 MW @ £1000/MWhAXLE 13.0 MW @ £642/MWhOAKTREE 12.0 MW @ £1031/MWhCUB 6.0 MW @ £595/MWhGRIDIMP 6.0 MW @ £500/MWhUTILITA 3.6 MW @ £340/MWhSSE 2.6 MW @ £750/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 240.0 MW | £32.3k | £135/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 6.0 MW | £760 | £127/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW267.3 MW rejected | £0 | £250/MWhrej |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW36.0 MW rejected | £0 | £1000/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW12.0 MW rejected | £0 | £950/MWhrej |
| CUB (UK) LTD | 0.0 MW6.0 MW rejected | £0 | £595/MWhrej |
| GRIDIMP LTD | 0.0 MW6.0 MW rejected | £0 | £500/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.6 MW rejected | £0 | £340/MWhrej |
| SSE DIGITAL SERVICES LIMITED | 0.0 MW2.6 MW rejected | £0 | £750/MWhrej |