NESO called a Turn Down event on 6 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 309.4 MW was procured against a 500.0 MW requirement (62% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
309.4 MW
62% of requirement
Bid Cost
£21.1k
Bids
40 / 95
accepted / total
Participants
11
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (8)
DRAX 36.0 MW @ £1000/MWhGRIDIMP 23.4 MW @ £300/MWhAXLE 13.0 MW @ £642/MWhGALLAGHER 12.0 MW @ £300/MWhOAKTREE 12.0 MW @ £1020/MWhCUB 6.0 MW @ £595/MWhUTILITA 3.6 MW @ £340/MWhSSE 2.6 MW @ £750/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 225.0 MW | £29.6k | £131/MWh |
| GRIDBEYOND LIMITED | 80.4 MW6.0 MW rejected | £12.0k | £149/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 4.0 MW2.0 MW rejected | £590 | £148/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW36.0 MW rejected | £0 | £1000/MWhrej |
| GRIDIMP LTD | 0.0 MW23.4 MW rejected | £0 | £300/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| GALLAGHER AGGREGATES LIMITED | 0.0 MW12.0 MW rejected | £0 | £300/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW12.0 MW rejected | £0 | £933/MWhrej |
| CUB (UK) LTD | 0.0 MW6.0 MW rejected | £0 | £595/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.6 MW rejected | £0 | £340/MWhrej |
| SSE DIGITAL SERVICES LIMITED | 0.0 MW2.6 MW rejected | £0 | £750/MWhrej |