DFS Monitorkilowatts.io
2025-03

6 Mar 2025

Turn Down

NESO called a Turn Down event on 6 Mar 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 319.5 MW was procured against a 500.0 MW requirement (64% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
319.5 MW
64% of requirement
Bid Cost
£17.6k
Bids
37 / 91
accepted / total
Participants
11

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (8)
OCTOPUS 296.6 MW @ £160/MWhGRIDBEYOND 43.8 MW @ £160/MWhOAKTREE 12.0 MW @ £940/MWhAXLE 11.3 MW @ £642/MWhCUB 6.0 MW @ £595/MWhEQUIWATT 4.0 MW @ £385/MWhUTILITA 3.3 MW @ £340/MWhSSE 2.6 MW @ £490/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
288.5 MW
£31.6k£110/MWh
GRIDIMP LTD
30.0 MW
£3.6k£120/MWh
HILDEBRAND TECHNOLOGY LIMITED
1.0 MW5.0 MW rejected
£120£120/MWh
OCTOPUS ENERGY LIMITED
0.0 MW296.6 MW rejected
£0£160/MWhrej
GRIDBEYOND LIMITED
0.0 MW43.8 MW rejected
£0£160/MWhrej
OAKTREE POWER LIMITED
0.0 MW12.0 MW rejected
£0£855/MWhrej
AXLE ENERGY LIMITED
0.0 MW11.3 MW rejected
£0£642/MWhrej
CUB (UK) LTD
0.0 MW6.0 MW rejected
£0£595/MWhrej
EQUIWATT LIMITED
0.0 MW4.0 MW rejected
£0£385/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.3 MW rejected
£0£340/MWhrej
SSE DIGITAL SERVICES LIMITED
0.0 MW2.6 MW rejected
£0£490/MWhrej