NESO called a Turn Down event on 10 Apr 2025, running from 17:00 to 21:00 across 8 half-hour settlement periods. 175.4 MW was procured against a 500.0 MW requirement (35% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
175.4 MW
35% of requirement
Bid Cost
£9.2k
Bids
30 / 50
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (4)
OCTOPUS 227.9 MW @ £150/MWhOAKTREE 20.0 MW @ £353/MWhEQUIWATT 4.0 MW @ £150/MWhSSE 2.6 MW @ £750/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 175.4 MW | £18.5k | £106/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW227.9 MW rejected | £0 | £150/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW20.0 MW rejected | £0 | £319/MWhrej |
| EQUIWATT LIMITED | 0.0 MW4.0 MW rejected | £0 | £150/MWhrej |
| SSE DIGITAL SERVICES LIMITED | 0.0 MW2.6 MW rejected | £0 | £750/MWhrej |