Turn Down

NESO called a Turn Down event on 10 May 2025, running from 18:00 to 21:00 across 6 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 1 participant submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 24
accepted / total
Participants
1

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (1)
GRIDBEYOND 65.4 MW @ £131/MWh

Half-Hour Periods

18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
GRIDBEYOND LIMITED
0.0 MW65.4 MW rejected
£0£130/MWhrej