NESO called a Turn Down event on 26 May 2025, running from 18:00 to 19:00 across 2 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 1 participant submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 8
accepted / total
Participants
1
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
All bids rejected (1)
GRIDBEYOND 36.8 MW @ £136/MWh
Half-Hour Periods
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| GRIDBEYOND LIMITED | 0.0 MW36.8 MW rejected | £0 | £136/MWhrej |