NESO called a Turn Down event on 1 Aug 2025, running from 19:00 to 20:00 across 2 half-hour settlement periods. 28.9 MW was procured against a 500.0 MW requirement (6% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
28.9 MW
6% of requirement
Bid Cost
£1.5k
Bids
12 / 20
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
All bids rejected (2)
GRIDBEYOND 16.8 MW @ £155/MWhGRIDIMP 2.0 MW @ £160/MWh
Half-Hour Periods
19:00
19:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 22.9 MW | £2.3k | £102/MWh |
| OAKTREE POWER LIMITED | 4.0 MW | £420 | £105/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 2.0 MW | £215 | £108/MWh |
| GRIDBEYOND LIMITED | 0.0 MW16.8 MW rejected | £0 | £155/MWhrej |
| GRIDIMP LTD | 0.0 MW2.0 MW rejected | £0 | £160/MWhrej |