10 Aug 2025

Turn Down

NESO called a Turn Down event on 10 Aug 2025, running from 19:00 to 20:00 across 2 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 8
accepted / total
Participants
2

Accepted Volume by Participant

Aggregated across 2 half-hour periods, sorted by accepted volume

All bids rejected (2)
GRIDBEYOND 16.8 MW @ £135/MWhGRIDIMP 2.0 MW @ £160/MWh

Half-Hour Periods

19:00
19:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
GRIDBEYOND LIMITED
0.0 MW16.8 MW rejected
£0£135/MWhrej
GRIDIMP LTD
0.0 MW2.0 MW rejected
£0£160/MWhrej