NESO called a Turn Down event on 14 Aug 2025, running from 19:00 to 21:00 across 4 half-hour settlement periods. 102.2 MW was procured against a 500.0 MW requirement (20% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
102.2 MW
20% of requirement
Bid Cost
£5.8k
Bids
3 / 28
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (4)
GRIDBEYOND 33.6 MW @ £140/MWhEQUIWATT 6.4 MW @ £135/MWhGRIDIMP 4.0 MW @ £160/MWhOAKTREE 4.0 MW @ £130/MWh
Half-Hour Periods
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 101.2 MW125.6 MW rejected | £11.4k | £113/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 1.0 MW3.0 MW rejected | £120 | £120/MWh |
| GRIDBEYOND LIMITED | 0.0 MW33.6 MW rejected | £0 | £140/MWhrej |
| EQUIWATT LIMITED | 0.0 MW6.4 MW rejected | £0 | £135/MWhrej |
| GRIDIMP LTD | 0.0 MW4.0 MW rejected | £0 | £160/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW4.0 MW rejected | £0 | £130/MWhrej |