NESO called a Turn Down event on 26 Aug 2025, running from 16:00 to 21:00 across 10 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 58
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
All bids rejected (6)
INFINIS 224.3 MW @ £106/MWhOCTOPUS 201.8 MW @ £145/MWhGRIDBEYOND 84.0 MW @ £140/MWhOAKTREE 14.0 MW @ £105/MWhEQUIWATT 7.2 MW @ £140/MWhGRIDIMP 4.0 MW @ £140/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 0.0 MW224.3 MW rejected | £0 | £105/MWhrej |
| OCTOPUS ENERGY LIMITED | 0.0 MW201.8 MW rejected | £0 | £145/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW84.0 MW rejected | £0 | £140/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW14.0 MW rejected | £0 | £104/MWhrej |
| EQUIWATT LIMITED | 0.0 MW7.2 MW rejected | £0 | £140/MWhrej |
| GRIDIMP LTD | 0.0 MW4.0 MW rejected | £0 | £140/MWhrej |