NESO called a Turn Down event on 2 Sep 2025, running from 17:00 to 21:00 across 8 half-hour settlement periods. 192.1 MW was procured against a 500.0 MW requirement (38% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
192.1 MW
38% of requirement
Bid Cost
£10.0k
Bids
20 / 20
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 170.1 MW | £17.5k | £101/MWh |
| OAKTREE POWER LIMITED | 22.0 MW | £2.4k | £110/MWh |