DFS Monitorkilowatts.io
2025-09

8 Sep 2025

Turn Down

NESO called a Turn Down event on 8 Sep 2025, running from 16:00 to 23:00 across 14 half-hour settlement periods. 633.8 MW was procured against a 500.0 MW requirement (127% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
633.8 MW
127% of requirement
Bid Cost
£39.6k
Bids
42 / 46
accepted / total
Participants
5

Accepted Volume by Participant

Aggregated across 14 half-hour periods, sorted by accepted volume

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
379.9 MW
£45.0k£117/MWh
OCTOPUS ENERGY LIMITED
212.7 MW
£29.4k£138/MWh
OAKTREE POWER LIMITED
24.0 MW
£2.8k£117/MWh
HILDEBRAND TECHNOLOGY LIMITED
10.0 MW4.0 MW rejected
£1.2k£120/MWh
EQUIWATT LIMITED
7.2 MW
£792£110/MWh