NESO called a Turn Down event on 30 Dec 2025, running from 16:00 to 18:00 across 4 half-hour settlement periods. 85.0 MW was procured against a 500.0 MW requirement (17% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
85.0 MW
17% of requirement
Bid Cost
£4.3k
Bids
4 / 8
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (1)
GRIDBEYOND 12.0 MW @ £250/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 85.0 MW | £8.5k | £100/MWh |
| GRIDBEYOND LIMITED | 0.0 MW12.0 MW rejected | £0 | £250/MWhrej |