Turn Down

NESO called a Turn Down event on 20 Jan 2026, running from 17:00 to 19:00 across 4 half-hour settlement periods. 96.9 MW was procured against a 500.0 MW requirement (19% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
96.9 MW
19% of requirement
Bid Cost
£5.3k
Bids
24 / 35
accepted / total
Participants
4

Accepted Volume by Participant

Aggregated across 4 half-hour periods, sorted by accepted volume

All bids rejected (2)
GRIDBEYOND 12.0 MW @ £200/MWhUTILITA 3.0 MW @ £340/MWh

Half-Hour Periods

17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
64.9 MW92.0 MW rejected
£7.1k£110/MWh
OAKTREE POWER LIMITED
32.0 MW
£3.5k£110/MWh
GRIDBEYOND LIMITED
0.0 MW12.0 MW rejected
£0£200/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.0 MW rejected