29 Jan 2026

Turn Down

NESO called a Turn Down event on 29 Jan 2026, running from 16:00 to 19:00 across 6 half-hour settlement periods. 154.6 MW was procured against a 500.0 MW requirement (31% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
154.6 MW
31% of requirement
Bid Cost
£9.4k
Bids
31 / 55
accepted / total
Participants
5

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (3)
OCTOPUS 326.6 MW @ £180/MWhEQUIWATT 14.4 MW @ £335/MWhUTILITA 3.0 MW @ £340/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
114.6 MW138.0 MW rejected
£13.7k£120/MWh
OAKTREE POWER LIMITED
40.0 MW8.0 MW rejected
£5.1k£127/MWh
OCTOPUS ENERGY LIMITED
0.0 MW326.6 MW rejected
£0£180/MWhrej
EQUIWATT LIMITED
0.0 MW14.4 MW rejected
£0£335/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.0 MW rejected
£0£340/MWhrej