NESO called a Turn Up event on 9 May 2026, running from 14:00 to 15:00 across 2 half-hour settlement periods. 0.0 MW was procured against a 300.0 MW requirement (0% fill rate), with 0 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 0
accepted / total
Participants
0
Half-Hour Periods
14:00
14:30
ProcuredSettledReq: 300.0 MW per period