NESO called a Turn Down event on 29 May 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 27.2 MW was procured against a 500.0 MW requirement (5% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
27.2 MW
5% of requirement
Bid Cost
£1.8k
Bids
52 / 52
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| EQUIWATT LIMITED | 17.2 MW | £2.7k | £155/MWh |
| OAKTREE POWER LIMITED | 10.0 MW | £950 | £95/MWh |