NESO called a Turn Down event on 5 Jun 2026, running from 18:00 to 23:00 across 10 half-hour settlement periods. 358.8 MW was procured against a 500.0 MW requirement (72% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
358.8 MW
72% of requirement
Bid Cost
£24.4k
Bids
105 / 105
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 337.0 MW | £45.6k | £135/MWh |
| EQUIWATT LIMITED | 17.2 MW | £2.7k | £155/MWh |
| OAKTREE POWER LIMITED | 4.0 MW | £500 | £125/MWh |
| U ENERGY GROUP LIMITED | 0.6 MW | £63 | £105/MWh |