NESO called a Turn Down event on 8 Jun 2026, running from 17:00 to 21:00 across 8 half-hour settlement periods. 50.2 MW was procured against a 500.0 MW requirement (10% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
50.2 MW
10% of requirement
Bid Cost
£3.0k
Bids
16 / 52
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (1)
EQUIWATT 6.0 MW @ £170/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 43.4 MW100.7 MW rejected | £5.2k | £120/MWh |
| OAKTREE POWER LIMITED | 6.8 MW | £765 | £113/MWh |
| EQUIWATT LIMITED | 0.0 MW6.0 MW rejected | £0 | £170/MWhrej |