NESO called a Turn Down event on 16 Jun 2026, running from 19:00 to 22:00 across 6 half-hour settlement periods. 468.7 MW was procured against a 292.0 MW requirement (161% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
292.0 MW
Procured
468.7 MW
161% of requirement
Bid Cost
£34.2k
Bids
115 / 115
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
Half-Hour Periods
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 292.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 250.2 MW | £33.6k | £134/MWh |
| OCTOPUS ENERGY LIMITED | 204.5 MW | £32.7k | £160/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 13.4 MW | £2.0k | £149/MWh |
| U ENERGY GROUP LIMITED | 0.6 MW | £78 | £130/MWh |