NESO called a Turn Down event on 24 Jul 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 678.5 MW was procured against a 500.0 MW requirement (136% fill rate), with 8 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
678.5 MW
136% of requirement
Bid Cost
£52.3k
Bids
208 / 222
accepted / total
Participants
8
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
All bids rejected (1)
AXLE 1.0 MW @ £202/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 417.1 MW | £64.0k | £154/MWh |
| OCTOPUS ENERGY LIMITED | 145.4 MW | £21.8k | £150/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 97.0 MW9.3 MW rejected | £15.8k | £162/MWh |
| EQUIWATT LIMITED | 15.6 MW | £2.5k | £160/MWh |
| U ENERGY GROUP LIMITED | 1.7 MW | £239 | £142/MWh |
| Shuffle Energy Limited | 0.9 MW | £130 | £144/MWh |
| OAKTREE POWER LIMITED | 0.8 MW0.6 MW rejected | £119 | £148/MWh |