NESO called a Turn Down event on 7 Aug 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 238.1 MW was procured against a 300.0 MW requirement (79% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
238.1 MW
79% of requirement
Bid Cost
£16.8k
Bids
144 / 151
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 137.1 MW | £18.6k | £138/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 89.6 MW | £13.3k | £148/MWh |
| EQUIWATT LIMITED | 9.3 MW3.1 MW rejected | £1.4k | £155/MWh |
| U ENERGY GROUP LIMITED | 1.5 MW | £218 | £149/MWh |
| OAKTREE POWER LIMITED | 0.6 MW | £75 | £126/MWh |