NESO called a Turn Down event on 26 Aug 2026, running from 17:00 to 20:00 across 6 half-hour settlement periods. 507.0 MW was procured against a 500.0 MW requirement (101% fill rate), with 7 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
507.0 MW
101% of requirement
Bid Cost
£43.4k
Bids
151 / 154
accepted / total
Participants
7
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 250.3 MW | £43.1k | £172/MWh |
| OCTOPUS ENERGY LIMITED | 172.9 MW | £29.0k | £168/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 65.7 MW | £11.3k | £171/MWh |
| EQUIWATT LIMITED | 16.0 MW | £3.0k | £185/MWh |
| U ENERGY GROUP LIMITED | 1.1 MW | £200 | £182/MWh |
| OAKTREE POWER LIMITED | 0.6 MW0.2 MW rejected | £109 | £182/MWh |
| Shuffle Energy Limited | 0.4 MW0.2 MW rejected | £70 | £175/MWh |