DFS Monitorkilowatts.io
← 2026-09

13 Sep 2026

Turn DownTurn Up

NESO called a Turn Down event on 13 Sep 2026, running from 17:00 to 14:00 across 10 half-hour settlement periods. 0.7 MW was procured against a 500.0 MW requirement (0% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
0.7 MW
0% of requirement
Bid Cost
£47
Bids
6 / 123
accepted / total
Participants
5

Accepted Volume by Participant

Aggregated across 10 half-hour periods, sorted by accepted volume

All bids rejected (2)
Shuffle 0.8 MW @ £175/MWhGRIDVOLT 0.6 MW @ £201/MWh

Half-Hour Periods

17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
13:00
13:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
Edgware Energy Limited
0.3 MW
£54£180/MWh
HILDEBRAND TECHNOLOGY LIMITED
0.2 MW13.1 MW rejected
£9£45/MWh
U ENERGY GROUP LIMITED
0.2 MW1.3 MW rejected
£32£160/MWh
Shuffle Energy Limited
0.0 MW0.8 MW rejected
£0£175/MWhrej
GRIDVOLT UK LIMITED
0.0 MW0.6 MW rejected
£0£201/MWhrej