NESO called a Turn Down event on 20 Sep 2026, running from 18:00 to 21:00 across 6 half-hour settlement periods. 10.2 MW was procured against a 200.0 MW requirement (5% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
200.0 MW
Procured
10.2 MW
5% of requirement
Bid Cost
£1.0k
Bids
60 / 60
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 200.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 9.6 MW | £1.9k | £199/MWh |
| Shuffle Energy Limited | 0.6 MW | £120 | £200/MWh |