DFS Monitorkilowatts.io
← 2026-09

26 Sep 2026

Turn Down

NESO called a Turn Down event on 26 Sep 2026, running from 18:00 to 23:00 across 10 half-hour settlement periods. 16.8 MW was procured against a 500.0 MW requirement (3% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
16.8 MW
3% of requirement
Bid Cost
£1.5k
Bids
74 / 78
accepted / total
Participants
3

Accepted Volume by Participant

Aggregated across 10 half-hour periods, sorted by accepted volume

Half-Hour Periods

18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
HILDEBRAND TECHNOLOGY LIMITED
14.9 MW
£2.7k£182/MWh
U ENERGY GROUP LIMITED
1.3 MW
£240£183/MWh
Shuffle Energy Limited
0.6 MW0.4 MW rejected
£122£204/MWh