NESO called a Turn Down event on 26 Sep 2026, running from 18:00 to 23:00 across 10 half-hour settlement periods. 16.8 MW was procured against a 500.0 MW requirement (3% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
16.8 MW
3% of requirement
Bid Cost
£1.5k
Bids
74 / 78
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 14.9 MW | £2.7k | £182/MWh |
| U ENERGY GROUP LIMITED | 1.3 MW | £240 | £183/MWh |
| Shuffle Energy Limited | 0.6 MW0.4 MW rejected | £122 | £204/MWh |