28 Sep 2026

Turn Down

NESO called a Turn Down event on 28 Sep 2026, running from 16:00 to 21:00 across 10 half-hour settlement periods. 684.7 MW was procured against a 500.0 MW requirement (137% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
684.7 MW
137% of requirement
Bid Cost
£74.5k
Bids
257 / 314
accepted / total
Participants
11

Accepted Volume by Participant

Aggregated across 10 half-hour periods, sorted by accepted volume

All bids rejected (1)
AXLE 37.6 MW @ £876/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
377.7 MW
£83.6k£219/MWh
OCTOPUS ENERGY LIMITED
252.4 MW
£53.0k£210/MWh
HILDEBRAND TECHNOLOGY LIMITED
25.0 MW
£5.7k£229/MWh
ENGIE POWER LIMITED
20.0 MW
£3.9k£196/MWh
EQUIWATT LIMITED
4.8 MW14.4 MW rejected
£1.7k£350/MWh
U ENERGY GROUP LIMITED
1.8 MW
£311£174/MWh
OAKTREE POWER LIMITED
1.2 MW
£365£304/MWh
Shuffle Energy Limited
1.0 MW
£200£200/MWh
GRIDIMP LIMITED
0.4 MW
£60£150/MWh
GRIDVOLT UK LIMITED
0.4 MW
£99£247/MWh
AXLE ENERGY LIMITED
0.0 MW37.6 MW rejected
£0£876/MWhrej