NESO called a Turn Down event on 3 Oct 2026, running from 16:00 to 22:00 across 12 half-hour settlement periods. 26.5 MW was procured against a 500.0 MW requirement (5% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
26.5 MW
5% of requirement
Bid Cost
£2.5k
Bids
112 / 112
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 12 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 24.0 MW | £4.6k | £192/MWh |
| U ENERGY GROUP LIMITED | 2.1 MW | £377 | £179/MWh |
| GRIDVOLT UK LIMITED | 0.4 MW | £70 | £176/MWh |