Turn Down

NESO called a Turn Down event on 3 Oct 2026, running from 16:00 to 22:00 across 12 half-hour settlement periods. 26.5 MW was procured against a 500.0 MW requirement (5% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
26.5 MW
5% of requirement
Bid Cost
£2.5k
Bids
112 / 112
accepted / total
Participants
3

Accepted Volume by Participant

Aggregated across 12 half-hour periods, sorted by accepted volume

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
HILDEBRAND TECHNOLOGY LIMITED
24.0 MW
£4.6k£192/MWh
U ENERGY GROUP LIMITED
2.1 MW
£377£179/MWh
GRIDVOLT UK LIMITED
0.4 MW
£70£176/MWh