DFS Monitorkilowatts.io
← 2026-10

17 Oct 2026

Turn Down

NESO called a Turn Down event on 17 Oct 2026, running from 17:00 to 21:00 across 8 half-hour settlement periods. 22.2 MW was procured against a 500.0 MW requirement (4% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
22.2 MW
4% of requirement
Bid Cost
£2.3k
Bids
112 / 112
accepted / total
Participants
3

Accepted Volume by Participant

Aggregated across 8 half-hour periods, sorted by accepted volume

Half-Hour Periods

17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
HILDEBRAND TECHNOLOGY LIMITED
20.6 MW
£4.2k£206/MWh
Shuffle Energy Limited
0.8 MW
£159£199/MWh
U ENERGY GROUP LIMITED
0.8 MW
£168£210/MWh