DFS Monitorkilowatts.io
← 2026-10

20 Oct 2026

Turn DownTurn UpTurn Up

NESO called a Turn Down event on 20 Oct 2026, running from 16:00 to 16:00 across 32 half-hour settlement periods. 142.3 MW was procured against a 500.0 MW requirement (28% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
142.3 MW
28% of requirement
Bid Cost
£14.6k
Bids
90 / 193
accepted / total
Participants
9

Accepted Volume by Participant

Aggregated across 32 half-hour periods, sorted by accepted volume

All bids rejected (3)
OCTOPUS 376.0 MW @ £178/MWhEQUIWATT 13.6 MW @ £235/MWhBryt 0.2 MW @ £235/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
105.4 MW40.7 MW rejected
£21.9k£204/MWh
ENGIE POWER LIMITED
23.0 MW
£4.3k£188/MWh
HILDEBRAND TECHNOLOGY LIMITED
12.5 MW11.6 MW rejected
£2.6k£212/MWh
Shuffle Energy Limited
0.9 MW1.1 MW rejected
£179£198/MWh
GRIDIMP LIMITED
0.4 MW
£60£150/MWh
U ENERGY GROUP LIMITED
0.1 MW0.9 MW rejected
£22£215/MWh
OCTOPUS ENERGY LIMITED
0.0 MW376.0 MW rejected
£0£173/MWhrej
EQUIWATT LIMITED
0.0 MW13.6 MW rejected
£0£235/MWhrej
Bryt Energy Limited
0.0 MW0.2 MW rejected
£0£235/MWhrej