NESO called a Turn Up event on 23 Oct 2026, running from 16:00 to 16:00 across 20 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 24
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 20 half-hour periods, sorted by accepted volume
All bids rejected (3)
OCTOPUS 132.5 MW @ £70/MWhGRIDVOLT 1.2 MW @ £66/MWhShuffle 0.8 MW @ £136/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 0.0 MW132.5 MW rejected | £0 | £70/MWhrej |
| GRIDVOLT UK LIMITED | 0.0 MW1.2 MW rejected | £0 | £66/MWhrej |
| Shuffle Energy Limited | 0.0 MW0.8 MW rejected | £0 | £115/MWhrej |