NESO called a Turn Up event on 25 Oct 2026, running from 16:00 to 16:00 across 24 half-hour settlement periods. 2.9 MW was procured against a 500.0 MW requirement (1% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
2.9 MW
1% of requirement
Bid Cost
£78
Bids
29 / 30
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 24 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| GRIDVOLT UK LIMITED | 1.9 MW0.2 MW rejected | £86 | £45/MWh |
| Shuffle Energy Limited | 1.0 MW | £70 | £70/MWh |