NESO called a Turn Down event on 24 Jan 2023, running from 16:30 to 18:00 across 3 half-hour settlement periods. 930.0 MW was procured against a 341.0 MW requirement (273% fill rate), with 19 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
341.0 MW
Procured
930.0 MW
273% of requirement
Bid Cost
£2.22m
Bids
99 / 102
accepted / total
Participants
19
Accepted Volume by Participant
Aggregated across 3 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:30
17:00
17:30
ProcuredSettledReq: 341.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OctopusEnergyLimited | 522.8 MW | £2.79m | £4875/MWh |
| GridbeyondLimited | 76.6 MW | £229.8k | £3000/MWh |
| DraxEnergySolutionsLimited | 69.0 MW | £279.0k | £3625/MWh |
| EONNextEnergyLimited | 50.0 MW | £186.0k | £4500/MWh |
| EngiePowerLimited | 37.5 MW | £206.3k | £5500/MWh |
| BritishGasTradingLimited | 36.0 MW | £144.0k | £4000/MWh |
| OVOElectricityLtd | 23.0 MW | £69.0k | £3000/MWh |
| EDFEnergyCustomersLimited | 22.0 MW | £132.0k | £6000/MWh |
| SoloEnergyLimited | 20.0 MW | £109.4k | £5467/MWh |
| OrangePowerLTD | 15.0 MW | £78.0k | £4299/MWh |
| FlexitricityLimited | 13.5 MW | £40.5k | £3000/MWh |
| PerseTechnologyLimited | 10.6 MW | £31.7k | £3000/MWh |
| CUBUKLtd | 9.0 MW | £52.5k | £5833/MWh |
| ConradEnergyTradingLimited | 6.9 MW | £27.6k | £3999/MWh |
| GridimpLimited | 6.0 MW | £18.0k | £3000/MWh |
| VpowerU8lectricLTD | 3.1 MW | £9.2k | £3000/MWh |
| EquiwattLimited | 3.0 MW | £11.5k | £3833/MWh |
| EvDOTEnergyLtd | 3.0 MW | £15.0k | £5000/MWh |
| ZenobeEnergyLimited | 3.0 MW | £16.5k | £5499/MWh |