DFS Monitorkilowatts.io
2023-12

19 Dec 2023

Turn Down

NESO called a Turn Down event on 19 Dec 2023, running from 17:00 to 18:00 across 2 half-hour settlement periods. 597.0 MW was procured against a 350.0 MW requirement (171% fill rate), with 22 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
350.0 MW
Procured
597.0 MW
171% of requirement
Bid Cost
£895.5k
Bids
74 / 74
accepted / total
Participants
22

Accepted Volume by Participant

Aggregated across 2 half-hour periods, sorted by accepted volume

Half-Hour Periods

17:00
17:30
ProcuredSettledReq: 350.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
BRITISH GAS TRADING LIMITED
163.0 MW
£489.0k£3000/MWh
OCTOPUS ENERGY LIMITED
129.0 MW
£387.0k£3000/MWh
EDF ENERGY CUSTOMERS LIMITED
56.0 MW
£168.0k£3000/MWh
INFINIS LIMITED
44.0 MW
£132.0k£3000/MWh
E.ON NEXT ENERGY LIMITED
32.0 MW
£96.0k£3000/MWh
ENGIE POWER LIMITED
26.0 MW
£78.0k£3000/MWh
DRAX ENERGY SOLUTIONS LIMITED
24.0 MW
£72.0k£3000/MWh
AXLE ENERGY LIMITED
20.0 MW
£60.0k£3000/MWh
SOLO ENERGY LIMITED
18.0 MW
£54.0k£3000/MWh
CONRAD ENERGY (TRADING) LIMITED
14.0 MW
£42.0k£3000/MWh
EQUIWATT LIMITED
12.0 MW
£36.0k£3000/MWh
GRIDBEYOND LIMITED
10.0 MW
£30.0k£3000/MWh
CUB (UK) LTD
8.0 MW
£24.0k£3000/MWh
PERSE TECHNOLOGY LIMITED
7.0 MW
£21.0k£3000/MWh
GRIDIMP LTD
6.0 MW
£18.0k£3000/MWh
HILDEBRAND TECHNOLOGY LIMITED
6.0 MW
£18.0k£3000/MWh
OAKTREE POWER LIMITED
6.0 MW
£18.0k£3000/MWh
OVO ELECTRICITY LTD
6.0 MW
£18.0k£3000/MWh
FLEXITRICITY LIMITED
4.0 MW
£12.0k£3000/MWh
CHAMELEON TECHNOLOGY (UK) LIMITED
2.0 MW
£6.0k£3000/MWh
ORANGE POWER LTD
2.0 MW
£6.0k£3000/MWh
UTILITA ENERGY LIMITED
2.0 MW
£6.0k£3000/MWh