NESO called a Turn Down event on 19 Dec 2023, running from 17:00 to 18:00 across 2 half-hour settlement periods. 597.0 MW was procured against a 350.0 MW requirement (171% fill rate), with 22 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
350.0 MW
Procured
597.0 MW
171% of requirement
Bid Cost
£895.5k
Bids
74 / 74
accepted / total
Participants
22
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
ProcuredSettledReq: 350.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| BRITISH GAS TRADING LIMITED | 163.0 MW | £489.0k | £3000/MWh |
| OCTOPUS ENERGY LIMITED | 129.0 MW | £387.0k | £3000/MWh |
| EDF ENERGY CUSTOMERS LIMITED | 56.0 MW | £168.0k | £3000/MWh |
| INFINIS LIMITED | 44.0 MW | £132.0k | £3000/MWh |
| E.ON NEXT ENERGY LIMITED | 32.0 MW | £96.0k | £3000/MWh |
| ENGIE POWER LIMITED | 26.0 MW | £78.0k | £3000/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 24.0 MW | £72.0k | £3000/MWh |
| AXLE ENERGY LIMITED | 20.0 MW | £60.0k | £3000/MWh |
| SOLO ENERGY LIMITED | 18.0 MW | £54.0k | £3000/MWh |
| CONRAD ENERGY (TRADING) LIMITED | 14.0 MW | £42.0k | £3000/MWh |
| EQUIWATT LIMITED | 12.0 MW | £36.0k | £3000/MWh |
| GRIDBEYOND LIMITED | 10.0 MW | £30.0k | £3000/MWh |
| CUB (UK) LTD | 8.0 MW | £24.0k | £3000/MWh |
| PERSE TECHNOLOGY LIMITED | 7.0 MW | £21.0k | £3000/MWh |
| GRIDIMP LTD | 6.0 MW | £18.0k | £3000/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 6.0 MW | £18.0k | £3000/MWh |
| OAKTREE POWER LIMITED | 6.0 MW | £18.0k | £3000/MWh |
| OVO ELECTRICITY LTD | 6.0 MW | £18.0k | £3000/MWh |
| FLEXITRICITY LIMITED | 4.0 MW | £12.0k | £3000/MWh |
| CHAMELEON TECHNOLOGY (UK) LIMITED | 2.0 MW | £6.0k | £3000/MWh |
| ORANGE POWER LTD | 2.0 MW | £6.0k | £3000/MWh |
| UTILITA ENERGY LIMITED | 2.0 MW | £6.0k | £3000/MWh |