NESO called a Turn Down event on 17 Jan 2024, running from 17:30 to 18:30 across 2 half-hour settlement periods. 751.0 MW was procured against a 400.0 MW requirement (188% fill rate), with 22 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
400.0 MW
Procured
751.0 MW
188% of requirement
Bid Cost
£1.13m
Bids
82 / 82
accepted / total
Participants
22
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:30
18:00
ProcuredSettledReq: 400.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 243.0 MW | £729.0k | £3000/MWh |
| BRITISH GAS TRADING LIMITED | 163.0 MW | £489.0k | £3000/MWh |
| EDF ENERGY CUSTOMERS LIMITED | 56.0 MW | £168.0k | £3000/MWh |
| E.ON NEXT ENERGY LIMITED | 54.0 MW | £162.0k | £3000/MWh |
| INFINIS LIMITED | 44.0 MW | £132.0k | £3000/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 30.0 MW | £90.0k | £3000/MWh |
| ENGIE POWER LIMITED | 26.0 MW | £78.0k | £3000/MWh |
| AXLE ENERGY LIMITED | 20.0 MW | £60.0k | £3000/MWh |
| SOLO ENERGY LIMITED | 18.0 MW | £54.0k | £3000/MWh |
| CONRAD ENERGY (TRADING) LIMITED | 14.0 MW | £42.0k | £3000/MWh |
| EQUIWATT LIMITED | 14.0 MW | £42.0k | £3000/MWh |
| GRIDBEYOND LIMITED | 12.0 MW | £36.0k | £3000/MWh |
| OVO ELECTRICITY LTD | 11.0 MW | £33.0k | £3000/MWh |
| CUB (UK) LTD | 8.0 MW | £24.0k | £3000/MWh |
| PERSE TECHNOLOGY LIMITED | 8.0 MW | £24.0k | £3000/MWh |
| GRIDIMP LTD | 6.0 MW | £18.0k | £3000/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 6.0 MW | £18.0k | £3000/MWh |
| OAKTREE POWER LIMITED | 6.0 MW | £18.0k | £3000/MWh |
| FLEXITRICITY LIMITED | 4.0 MW | £12.0k | £3000/MWh |
| UTILITA ENERGY LIMITED | 4.0 MW | £12.0k | £3000/MWh |
| ORANGE POWER LTD | 2.0 MW | £6.0k | £3000/MWh |
| SSE DIGITAL SERVICES LIMITED | 2.0 MW | £6.0k | £3000/MWh |