NESO called a Turn Down event on 2 Feb 2024, running from 17:00 to 18:00 across 2 half-hour settlement periods. 318.0 MW was procured against a 200.0 MW requirement (159% fill rate), with 23 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
200.0 MW
Procured
318.0 MW
159% of requirement
Bid Cost
£301.3k
Bids
44 / 94
accepted / total
Participants
23
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
All bids rejected (13)
BRITISH 163.0 MW @ £3000/MWhEDF 56.0 MW @ £3000/MWhINFINIS 44.0 MW @ £2950/MWhOAKTREE 26.0 MW @ £4273/MWhAXLE 20.0 MW @ £2989/MWhEQUIWATT 16.0 MW @ £2950/MWhPERSE 14.0 MW @ £3000/MWhGRIDBEYOND 12.0 MW @ £3000/MWhOVO 8.0 MW @ £3000/MWhUTILITA 8.0 MW @ £4249/MWhFLEXITRICITY 4.0 MW @ £3000/MWhORANGE 2.0 MW @ £5799/MWhSSE 2.0 MW @ £2999/MWh
Half-Hour Periods
17:00
17:30
ProcuredSettledReq: 200.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 154.0 MW | £269.5k | £1750/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 46.0 MW16.0 MW rejected | £99.0k | £1875/MWh |
| E.ON NEXT ENERGY LIMITED | 36.0 MW | £54.0k | £1500/MWh |
| ENGIE POWER LIMITED | 26.0 MW | £52.0k | £2000/MWh |
| SOLO ENERGY LIMITED | 22.0 MW | £45.0k | £2333/MWh |
| CUB (UK) LTD | 12.0 MW | £30.0k | £2498/MWh |
| URBAN RESERVE (ASSETCO 2) LIMITED | 8.0 MW | £20.0k | £2500/MWh |
| GRIDIMP LTD | 6.0 MW | £15.0k | £2500/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 6.0 MW | £15.0k | £2500/MWh |
| LEVELISE LIMITED | 2.0 MW | £3.2k | £1600/MWh |
| BRITISH GAS TRADING LIMITED | 0.0 MW163.0 MW rejected | £0 | £3000/MWhrej |
| EDF ENERGY CUSTOMERS LIMITED | 0.0 MW56.0 MW rejected | £0 | £3000/MWhrej |
| INFINIS LIMITED | 0.0 MW44.0 MW rejected | £0 | £2950/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW26.0 MW rejected | £0 | £4250/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW20.0 MW rejected | £0 | £2989/MWhrej |
| EQUIWATT LIMITED | 0.0 MW16.0 MW rejected | £0 | £2950/MWhrej |
| PERSE TECHNOLOGY LIMITED | 0.0 MW14.0 MW rejected | £0 | £3000/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW12.0 MW rejected | £0 | £3000/MWhrej |
| OVO ELECTRICITY LTD | 0.0 MW8.0 MW rejected | £0 | £3000/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW8.0 MW rejected | £0 | £4249/MWhrej |
| FLEXITRICITY LIMITED | 0.0 MW4.0 MW rejected | £0 | £3000/MWhrej |
| ORANGE POWER LTD | 0.0 MW2.0 MW rejected | £0 | £5799/MWhrej |
| SSE DIGITAL SERVICES LIMITED | 0.0 MW2.0 MW rejected | £0 | £2999/MWhrej |