NESO called a Turn Down event on 11 Feb 2025, running from 17:00 to 19:00 across 4 half-hour settlement periods. 164.0 MW was procured against a 200.0 MW requirement (82% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
200.0 MW
Procured
164.0 MW
82% of requirement
Bid Cost
£11.9k
Bids
24 / 57
accepted / total
Participants
9
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (7)
OCTOPUS 269.4 MW @ £250/MWhGRIDIMP 15.6 MW @ £500/MWhAXLE 11.0 MW @ £642/MWhOAKTREE 10.0 MW @ £1111/MWhGALLAGHER 8.0 MW @ £200/MWhCUB 4.0 MW @ £595/MWhUTILITA 3.5 MW @ £340/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
ProcuredSettledReq: 200.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 160.0 MW | £23.2k | £145/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 4.0 MW | £590 | £148/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW269.4 MW rejected | £0 | £250/MWhrej |
| GRIDIMP LTD | 0.0 MW15.6 MW rejected | £0 | £500/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW11.0 MW rejected | £0 | £642/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW10.0 MW rejected | £0 | £1111/MWhrej |
| GALLAGHER AGGREGATES LIMITED | 0.0 MW8.0 MW rejected | £0 | £200/MWhrej |
| CUB (UK) LTD | 0.0 MW4.0 MW rejected | £0 | £595/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.5 MW rejected | £0 | £340/MWhrej |