DFS Monitorkilowatts.io
2025-02

12 Feb 2025

Turn Down

NESO called a Turn Down event on 12 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 609.1 MW was procured against a 300.0 MW requirement (203% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
300.0 MW
Procured
609.1 MW
203% of requirement
Bid Cost
£45.2k
Bids
58 / 94
accepted / total
Participants
11

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (6)
DRAX 36.0 MW @ £1000/MWhAXLE 13.0 MW @ £642/MWhOAKTREE 12.0 MW @ £935/MWhCUB 6.0 MW @ £595/MWhSSE 3.9 MW @ £750/MWhUTILITA 3.5 MW @ £340/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 300.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
OCTOPUS ENERGY LIMITED
270.7 MW
£40.6k£150/MWh
INFINIS LIMITED
240.0 MW
£35.6k£148/MWh
GRIDBEYOND LIMITED
80.4 MW6.0 MW rejected
£12.0k£149/MWh
GALLAGHER AGGREGATES LIMITED
12.0 MW
£1.4k£120/MWh
HILDEBRAND TECHNOLOGY LIMITED
6.0 MW
£890£148/MWh
DRAX ENERGY SOLUTIONS LIMITED
0.0 MW36.0 MW rejected
£0£1000/MWhrej
AXLE ENERGY LIMITED
0.0 MW13.0 MW rejected
£0£642/MWhrej
OAKTREE POWER LIMITED
0.0 MW12.0 MW rejected
£0£853/MWhrej
CUB (UK) LTD
0.0 MW6.0 MW rejected
£0£595/MWhrej
SSE DIGITAL SERVICES LIMITED
0.0 MW3.9 MW rejected
£0£750/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.5 MW rejected
£0£340/MWhrej