NESO called a Turn Down event on 12 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 609.1 MW was procured against a 300.0 MW requirement (203% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
609.1 MW
203% of requirement
Bid Cost
£45.2k
Bids
58 / 94
accepted / total
Participants
11
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (6)
DRAX 36.0 MW @ £1000/MWhAXLE 13.0 MW @ £642/MWhOAKTREE 12.0 MW @ £935/MWhCUB 6.0 MW @ £595/MWhSSE 3.9 MW @ £750/MWhUTILITA 3.5 MW @ £340/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 270.7 MW | £40.6k | £150/MWh |
| INFINIS LIMITED | 240.0 MW | £35.6k | £148/MWh |
| GRIDBEYOND LIMITED | 80.4 MW6.0 MW rejected | £12.0k | £149/MWh |
| GALLAGHER AGGREGATES LIMITED | 12.0 MW | £1.4k | £120/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 6.0 MW | £890 | £148/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW36.0 MW rejected | £0 | £1000/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW12.0 MW rejected | £0 | £853/MWhrej |
| CUB (UK) LTD | 0.0 MW6.0 MW rejected | £0 | £595/MWhrej |
| SSE DIGITAL SERVICES LIMITED | 0.0 MW3.9 MW rejected | £0 | £750/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.5 MW rejected | £0 | £340/MWhrej |