NESO called a Turn Down event on 14 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 65.4 MW was procured against a 500.0 MW requirement (13% fill rate), with 8 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
65.4 MW
13% of requirement
Bid Cost
£4.5k
Bids
14 / 48
accepted / total
Participants
8
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (5)
AXLE 13.0 MW @ £642/MWhOAKTREE 12.0 MW @ £935/MWhCUB 6.0 MW @ £595/MWhSSE 3.9 MW @ £490/MWhUTILITA 3.5 MW @ £340/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| GRIDBEYOND LIMITED | 53.6 MW32.8 MW rejected | £7.5k | £140/MWh |
| GRIDIMP LTD | 7.8 MW | £858 | £110/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 4.0 MW2.0 MW rejected | £600 | £150/MWh |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW12.0 MW rejected | £0 | £853/MWhrej |
| CUB (UK) LTD | 0.0 MW6.0 MW rejected | £0 | £595/MWhrej |
| SSE DIGITAL SERVICES LIMITED | 0.0 MW3.9 MW rejected | £0 | £490/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.5 MW rejected | £0 | £340/MWhrej |