Turn Down

NESO called a Turn Down event on 23 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 1 participant submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 18
accepted / total
Participants
1

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (1)
GRIDBEYOND 104.4 MW @ £110/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
GRIDBEYOND LIMITED
0.0 MW104.4 MW rejected
£0£123/MWhrej