2025-02

24 Feb 2025

Turn Down

NESO called a Turn Down event on 24 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 49.2 MW was procured against a 500.0 MW requirement (10% fill rate), with 8 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
49.2 MW
10% of requirement
Bid Cost
£3.6k
Bids
12 / 53
accepted / total
Participants
8

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (6)
OCTOPUS 274.9 MW @ £150/MWhGRIDIMP 24.0 MW @ £150/MWhAXLE 13.0 MW @ £642/MWhOAKTREE 10.0 MW @ £1013/MWhCUB 6.0 MW @ £595/MWhUTILITA 3.3 MW @ £340/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
GRIDBEYOND LIMITED
43.2 MW24.0 MW rejected
£6.4k£149/MWh
HILDEBRAND TECHNOLOGY LIMITED
6.0 MW
£720£120/MWh
OCTOPUS ENERGY LIMITED
0.0 MW274.9 MW rejected
£0£150/MWhrej
GRIDIMP LTD
0.0 MW24.0 MW rejected
£0£150/MWhrej
AXLE ENERGY LIMITED
0.0 MW13.0 MW rejected
£0£642/MWhrej
OAKTREE POWER LIMITED
0.0 MW10.0 MW rejected
£0£910/MWhrej
CUB (UK) LTD
0.0 MW6.0 MW rejected
£0£595/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.3 MW rejected
£0£340/MWhrej