DFS Monitorkilowatts.io
2025-03

3 Mar 2025

Turn Down

NESO called a Turn Down event on 3 Mar 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 354.9 MW was procured against a 500.0 MW requirement (71% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
354.9 MW
71% of requirement
Bid Cost
£27.5k
Bids
31 / 59
accepted / total
Participants
9

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (5)
AXLE 13.0 MW @ £642/MWhOAKTREE 12.0 MW @ £946/MWhCUB 6.0 MW @ £595/MWhEQUIWATT 4.0 MW @ £490/MWhUTILITA 3.3 MW @ £340/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
OCTOPUS ENERGY LIMITED
297.1 MW
£47.8k£161/MWh
GRIDBEYOND LIMITED
37.8 MW6.0 MW rejected
£4.4k£118/MWh
GRIDIMP LTD
15.0 MW
£1.9k£130/MWh
HILDEBRAND TECHNOLOGY LIMITED
5.0 MW1.0 MW rejected
£740£148/MWh
AXLE ENERGY LIMITED
0.0 MW13.0 MW rejected
£0£642/MWhrej
OAKTREE POWER LIMITED
0.0 MW12.0 MW rejected
£0£864/MWhrej
CUB (UK) LTD
0.0 MW6.0 MW rejected
£0£595/MWhrej
EQUIWATT LIMITED
0.0 MW4.0 MW rejected
£0£490/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.3 MW rejected
£0£340/MWhrej