NESO called a Turn Down event on 2 Mar 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 27.2 MW was procured against a 500.0 MW requirement (5% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
27.2 MW
5% of requirement
Bid Cost
£1.6k
Bids
10 / 22
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (1)
AXLE 13.0 MW @ £642/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| GRIDBEYOND LIMITED | 27.2 MW16.6 MW rejected | £3.3k | £121/MWh |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |