2 Mar 2025

Turn Down

NESO called a Turn Down event on 2 Mar 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 27.2 MW was procured against a 500.0 MW requirement (5% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
27.2 MW
5% of requirement
Bid Cost
£1.6k
Bids
10 / 22
accepted / total
Participants
2

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (1)
AXLE 13.0 MW @ £642/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
GRIDBEYOND LIMITED
27.2 MW16.6 MW rejected
£3.3k£121/MWh
AXLE ENERGY LIMITED
0.0 MW13.0 MW rejected
£0£642/MWhrej