DFS Monitorkilowatts.io
2025-03

17 Mar 2025

Turn Down

NESO called a Turn Down event on 17 Mar 2025, running from 17:00 to 19:00 across 4 half-hour settlement periods. 195.5 MW was procured against a 500.0 MW requirement (39% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
195.5 MW
39% of requirement
Bid Cost
£13.5k
Bids
44 / 75
accepted / total
Participants
11

Accepted Volume by Participant

Aggregated across 4 half-hour periods, sorted by accepted volume

All bids rejected (7)
OCTOPUS 271.6 MW @ £165/MWhOAKTREE 14.0 MW @ £866/MWhAXLE 13.0 MW @ £642/MWhCUB 4.0 MW @ £595/MWhUTILITA 3.3 MW @ £340/MWhSSE 2.6 MW @ £490/MWhEQUIWATT 2.0 MW @ £385/MWh

Half-Hour Periods

17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
162.9 MW
£22.3k£137/MWh
GRIDBEYOND LIMITED
20.6 MW12.6 MW rejected
£3.0k£143/MWh
GALLAGHER AGGREGATES LIMITED
8.0 MW
£1.1k£140/MWh
HILDEBRAND TECHNOLOGY LIMITED
4.0 MW
£495£124/MWh
OCTOPUS ENERGY LIMITED
0.0 MW271.6 MW rejected
£0£165/MWhrej
OAKTREE POWER LIMITED
0.0 MW14.0 MW rejected
£0£783/MWhrej
AXLE ENERGY LIMITED
0.0 MW13.0 MW rejected
£0£642/MWhrej
CUB (UK) LTD
0.0 MW4.0 MW rejected
£0£595/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.3 MW rejected
£0£340/MWhrej
SSE DIGITAL SERVICES LIMITED
0.0 MW2.6 MW rejected
£0£490/MWhrej
EQUIWATT LIMITED
0.0 MW2.0 MW rejected
£0£385/MWhrej