NESO called a Turn Down event on 18 Mar 2025, running from 18:00 to 19:00 across 2 half-hour settlement periods. 64.0 MW was procured against a 300.0 MW requirement (21% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
64.0 MW
21% of requirement
Bid Cost
£4.2k
Bids
15 / 46
accepted / total
Participants
10
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
All bids rejected (7)
OCTOPUS 280.0 MW @ £157/MWhGRIDBEYOND 16.6 MW @ £149/MWhOAKTREE 14.0 MW @ £3698/MWhAXLE 13.0 MW @ £642/MWhUTILITA 2.2 MW @ £340/MWhCUB 2.0 MW @ £595/MWhEQUIWATT 2.0 MW @ £385/MWh
Half-Hour Periods
18:00
18:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 59.0 MW | £7.6k | £130/MWh |
| GALLAGHER AGGREGATES LIMITED | 4.0 MW | £560 | £140/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 1.0 MW1.0 MW rejected | £130 | £130/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW280.0 MW rejected | £0 | £157/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW16.6 MW rejected | £0 | £149/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW14.0 MW rejected | £0 | £3528/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW2.2 MW rejected | £0 | £340/MWhrej |
| CUB (UK) LTD | 0.0 MW2.0 MW rejected | £0 | £595/MWhrej |
| EQUIWATT LIMITED | 0.0 MW2.0 MW rejected | £0 | £385/MWhrej |