DFS Monitorkilowatts.io
2025-03

26 Mar 2025

Turn Down

NESO called a Turn Down event on 26 Mar 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 63.8 MW was procured against a 300.0 MW requirement (21% fill rate), with 7 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
300.0 MW
Procured
63.8 MW
21% of requirement
Bid Cost
£4.2k
Bids
34 / 57
accepted / total
Participants
7

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (3)
OCTOPUS 273.2 MW @ £154/MWhAXLE 11.3 MW @ £642/MWhUTILITA 3.2 MW @ £340/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 300.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
GRIDBEYOND LIMITED
41.8 MW2.0 MW rejected
£5.7k£136/MWh
OAKTREE POWER LIMITED
8.0 MW10.0 MW rejected
£844£106/MWh
GALLAGHER AGGREGATES LIMITED
8.0 MW4.0 MW rejected
£1.2k£150/MWh
HILDEBRAND TECHNOLOGY LIMITED
6.0 MW
£675£113/MWh
OCTOPUS ENERGY LIMITED
0.0 MW273.2 MW rejected
£0£154/MWhrej
AXLE ENERGY LIMITED
0.0 MW11.3 MW rejected
£0£642/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.2 MW rejected
£0£340/MWhrej