DFS Monitorkilowatts.io
2025-03

28 Mar 2025

Turn Down

NESO called a Turn Down event on 28 Mar 2025, running from 18:00 to 19:00 across 2 half-hour settlement periods. 23.2 MW was procured against a 500.0 MW requirement (5% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
23.2 MW
5% of requirement
Bid Cost
£1.5k
Bids
12 / 26
accepted / total
Participants
10

Accepted Volume by Participant

Aggregated across 2 half-hour periods, sorted by accepted volume

All bids rejected (6)
OCTOPUS 265.8 MW @ £150/MWhAXLE 5.0 MW @ £642/MWhOAKTREE 4.0 MW @ £171/MWhEQUIWATT 3.8 MW @ £150/MWhSSE 2.6 MW @ £490/MWhUTILITA 2.0 MW @ £340/MWh

Half-Hour Periods

18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
GRIDBEYOND LIMITED
14.6 MW
£2.0k£140/MWh
CUB (UK) LTD
3.8 MW
£380£100/MWh
GRIDIMP LTD
2.8 MW
£336£120/MWh
HILDEBRAND TECHNOLOGY LIMITED
2.0 MW
£245£123/MWh
OCTOPUS ENERGY LIMITED
0.0 MW265.8 MW rejected
£0£150/MWhrej
AXLE ENERGY LIMITED
0.0 MW5.0 MW rejected
£0£642/MWhrej
OAKTREE POWER LIMITED
0.0 MW4.0 MW rejected
£0£171/MWhrej
EQUIWATT LIMITED
0.0 MW3.8 MW rejected
£0£150/MWhrej
SSE DIGITAL SERVICES LIMITED
0.0 MW2.6 MW rejected
£0£490/MWhrej
UTILITA ENERGY LIMITED
0.0 MW2.0 MW rejected
£0£340/MWhrej